Service area · Davidson County
Nashville landscaping for old yards and new builds alike
In Nashville, 41 percent of homes predate 1980 and 22 percent went up in 2010 or later, and each kind of lot asks for different work.
TL;DR
Nashville is about 12 miles from Wilhelm’s Brentwood base, and its housing comes in two kinds: 41 percent was built before 1980, while 22 percent dates from 2010 or later. Older lots bring settled grades and big roots; newer ones bring compacted fill. Metro Water Services’ Stormwater Division issues grading permits, but landscaping on an existing lot that changes the grade 18 inches or less is exempt. A Nashville homeowner, A. S., reviewed the retaining wall Wilhelm built for them on Nextdoor in 2024.
Is landscaping an older Nashville house different from a new one?
Yes, and the difference sits mostly below ground. A house built before 1980, which describes 41 percent of the city’s homes, usually comes with trees whose roots run under the lawn, beds that have sunk below the edging, and a grade that has slowly settled back toward the foundation. A house from 2010 or later, 22 percent of the stock, tends to have the opposite problem: thin topsoil, subsoil compacted by equipment, and a builder’s grade that was never checked once the sod was down.
The soil underneath helps in much of the city. Maury, a very deep, well drained silt over phosphatic limestone, covers 34 percent of the ground mapped around Nashville’s center. So an older lot often needs new beds and planting worked around the roots, while a newer one starts with grading and soil prep before anything is planted.
When does a Nashville landscaping job need a Metro grading permit?
Only when the earthwork gets past Metro’s limits. Metro Water Services’ Stormwater Division issues grading permits, and work needs none if it stays within all of three thresholds: 100 cubic yards of soil or less, 10,000 square feet or less, and fill under 5 feet deep. Landscaping on an existing lot with a grade change of 18 inches or less is exempt, and so is finish grading for retaining walls, pools and basements.
Trees are handled differently. The same Metro page says tree cutting requires a tree removal permit, which matters when an old oak or a row of volunteer trees stands where a patio or a wall is planned. Sorting out what applies before the first machine arrives is part of Project Planning & Consulting.
What did a Nashville homeowner say about the retaining wall Wilhelm built?
That it came out right. A. S., a Nashville homeowner, wrote on Nextdoor in March 2024 that “Hunter returned a prompt quote and confirmed our hardscaping requirements for a retaining wall.” They had collected three quotes and chose Wilhelm on the price and the detail. Afterward they wrote: “Our end result is perfect, communication during the work was excellent and his crew was very respectful of our property.”
Retaining walls come up often on Nashville ground because parts of it are steep. Stiversville soil, mapped on 5 percent of the ground around the city’s center, sits at a median slope of 14 percent, and Mimosa clay at 9 percent. A wall that holds a slope like that needs a compacted base, free-draining stone and a pipe behind it, all part of Hardscape Construction.
04Answers
Nashville questions
Do I need a permit to regrade my yard in Nashville?
Not if the grade changes 18 inches or less on an existing lot, which Metro Water Services treats as exempt landscaping. Bigger work still needs no permit when it stays within 100 cubic yards, 10,000 square feet and fill under 5 feet deep. Past any one of those, the Stormwater Division issues a grading permit.
Is a tree removal permit required in Nashville?
Yes, according to Metro Water Services: its page on grading permits states that tree cutting requires a tree removal permit. Settle that before a tree comes out for a patio, a wall or a new bed, so the answer is part of the plan rather than a surprise halfway through the job.
Does Wilhelm build retaining walls in Nashville?
Yes. After weighing three quotes, a Nashville customer who signs Nextdoor reviews as A. S. chose Wilhelm for a retaining wall and called the result perfect. Each wall goes on a compacted base with drainage stone and a pipe behind it, and the estimate comes free after a site visit.
What is the soil like in Nashville yards?
Around the center of the city it is mostly Maury, a very deep, well drained silty soil over weathered phosphatic limestone, mapped on 34 percent of the ground. Lindell, a moderately well drained flood-plain soil, covers another 17 percent, and those lower spots stay wet longer after a heavy rain.