Service area · Davidson County
Oak Hill’s hillsides need walls, steps and a plan
About 5 miles from Brentwood, Oak Hill pairs mid-century homes with hillsides that drop away fast.
TL;DR
Oak Hill’s median home was built in 1958, and 75 percent of its housing predates 1980, so most yards carry mature trees and grades set long ago. The ground is steep: Mimosa clay at a median slope of 16 percent and gravelly Bodine at 35 percent make up more than half of what is mapped around the city’s center. That puts retaining walls, steps and runoff control ahead of new planting. Permit questions for an Oak Hill address are handled as part of Project Planning & Consulting.
How do you fit a usable patio onto a steep Oak Hill lot?
By building the level ground first, usually with a low retaining wall and a set of steps. Bodine, which covers 22 percent of the ground mapped around Oak Hill’s center, sits at a median slope of 35 percent, and Sulphura, another 8 percent, at the same steepness. On a hillside like that, a patio is cut into the slope and held by a wall on the low side, or set on a terrace with the wall above it.
Height drives the design. A wall of a couple of feet can be stacked block on a compacted base with stone behind it, while walls over about four feet are, as a general rule, engineered. Planning the terraces, the steps between them and the patio on top as one job keeps the walls from being an afterthought.
Why does rain run off my Oak Hill yard instead of soaking in?
Because the most common soil there is a slow-draining clay on a real slope. Mimosa, mapped on 36 percent of the ground around Oak Hill, is a deep, well drained but slowly permeable soil formed in clayey residuum from phosphatic limestone, and its median slope here is 16 percent. Rain lands faster than it can enter, picks up speed downhill and carries mulch and topsoil with it.
Bodine works the other way. It is gravelly and somewhat excessively drained, so it dries out fast between storms and leaves plants thirsty. A good plan slows water at the top of the yard, spreads it with terraces and plantings, and sends what is left down a dry creek bed or a buried drain instead of across the lawn.
What happens to old beds and big trees when an Oak Hill yard is redone?
The trees worth keeping set the plan, and the beds get rebuilt around them. With a median build year of 1958, most Oak Hill lots have trees that were planted or spared generations ago, foundation shrubs that have outgrown the windows, and beds whose soil has long since worn thin. Only 1 percent of the homes went up in the 2000s, though 14 percent date from 2010 or later.
Hunter studied landscape architecture at the University of Tennessee, Knoxville, and a design for a lot like this starts with what stays. Digging on Oak Hill’s gravelly Bodine and moderately deep Sulphura is slower than in deep silt, so it goes into the estimate. Whether the work needs a permit is checked under Project Planning & Consulting.
04Answers
Oak Hill questions
Can you build retaining walls on steep lots in Oak Hill, TN?
Yes. Retaining walls and steps are how most steep yards become usable, and a wall that holds a hillside needs a compacted base, drainage stone and a pipe behind it. Walls taller than about four feet generally call for an engineered design, which is settled during planning before any block is ordered.
Do I need a permit for landscaping in Oak Hill?
It depends on what the work includes. Planting, mulch and sod rarely need one, while tall walls, roofed structures and new electrical often do. Checking what applies at an Oak Hill address is part of Wilhelm’s Project Planning & Consulting, and it happens before any digging starts.
Why is digging so slow in Oak Hill yards?
Because much of the ground is Bodine, a gravelly soil formed from cherty limestone, covering 22 percent of the area mapped around the city’s center. Chert fragments slow every trench and planting hole. Sulphura, another 8 percent, is only moderately deep, so rock can turn up sooner than expected.
How old are most homes in Oak Hill, TN?
Most predate 1980, 75 percent of them, and the median build year is 1958. Only 1 percent went up in the 2000s, while 14 percent date from 2010 or later. For a landscape, that means established trees, long-settled grades and beds that are often due for a rebuild.